News
Current Projects
United States Six projects currently in progress with BSIS personnel providing on site Construction Management, Safety Management and High Angle/Confined Space Rescue Stand-by.
Trinidad W.I. Providing project management as part of a joint-venture arrangement overseeing the installation and erection of all the mechanical and piping systems for a 760 megawatt power plant in La Brea, Trinidad W.I. Oversight will be provided for the installation and erection of 6 Gas Turbine Generators, 2 Steam Turbine Generators, 6 Boilers, two Air Cooled Condenser banks, structural steel, water treatment facility, piping-racks and all piping associated with the project. Pipig includes Carbon Steel, Stainless Steel and Chrome ranging in size from 1/2" to 24". This is a grass-roots project expected starting in late 2009. The project is currently 90% complete with the peak staffing at 1,200+ craftsmen.
Project management team provides oversight in all of the following areas: onsite day-to-day management of the project including all commercial and contractual issues; staff management; field supervision at all levels; safety management; quality management; cost controls; planning; scheduling; field engineering, document control; and hydro-testing.
Recent Projects
Wyoming Turn Around Management – API 510 Inspection – Sec VIII Div 1 Specialty Operation – Supervised the internal inspection to API 510 requirements Project Planning Project Scheduling Project Cost Controls with budgets up to 13 million US Project Execution managed up to 250 personnel Repair of Pressure vessels as required by discovery inspection Turn Around Management – Piping and Valves Specialty Operation Supervised the modifications to piping systems Project Planning Project Scheduling Project Cost Controls Project Execution Project staffed with up to 500 men
Various Projects Construction – Managed Piping and Mechanical contacts – Atlantic LNC Trinidad – Bechtel International Specialty Operation – Repair HK40 cast tubing hangers in Coke heater before startup – Petrozuata – Venezuela Specialty Operation – Repair discharge nozzle on live LNG tank – Sonatrach – Kellogg – Skikda, Algeria Renovation – Install piping and specialized coatings to seawater cooling system – Sonatrach – Bechtel – GL1.Z Bethioua, Algeria Specialty Operation – Replace suction and discharge valves on three live LNG tanks simultaneously during 4 days outage Specialty Operations – Replace the catalyst on CBA and Clause beds for BP – Whitney Canyon Gas Plant – Evanston, Wyoming
Bechtel Int. – Atlantic LNG Plant Managed Piping and Mechanical contracts for construction of all four trains of LNG Plant in Point Fortin, Trinidad Installed over 250,000 liner meters of piping ranging in diameters from ½’” to 72” – carbon steel, low-temp carbon steel and stainless steel Work force peaked at 1,500 craftsmen – accumulated over 10 million manhours Installed all static and rotating equipment including 26 compressors on elevated decks and alignment
Petrozuata – La Porta, Venezuela Replaced Tubing Hangers on Coke Heaters prior to startup Specialized material requiring specialized technique – HK40 SS Cast Cut and removed tubes – cut and removed damaged portion of hanger – replace with new cast hangar and welded out – reinstalled tubes and welded out
Kellogg/Sonatrach – Algeria Specialty Operation – Repaired discharged nozzle on live LNG tank Utilized Nitrogen Work Room and Life Support Gear to work in 100% nitrogen environment to facilitate repair Isolated 16” aluminum line Removed damaged pipe and welded on new flange Installed new spool and valve
Bechtel/Sonatrach – Algeria Renovation – Installed piping and specialized coatings to seawater cooling system – Sonatrach – Bechtel – GL1.Z Bethioua, Algeria Modified / fabricated spools as required Applied flake-glass vinyl-esther coating to piping and seawater distribution box Specialty Operation – Replaced suction and discharge valves on three live LNG tankssimultaneously during 4 days outage Valves were 24” and 42” valves – 14 each – and also included all ancillary piping Scope included process design and energy isolation Managed local subcontractors in NWR fabrication
BP – WCOC – Evanston, Wyoming Specialty Operation – Remove and replace catalyst in CBA and Clause Beds Requires that vessels be under 100% nitrogen purge to displace all oxygen Personnel utilize specialized life support gear and equipment to protect and monitor Have been performing this function since 1992 Have been providing safety services since 1982
|